Does anyone know how I can flush the communications for the
ethernet channel on a SLC 5/05 on first scan of the program?
The reason is as follows:
I have two identical processors, powered all the time.
One is connected to the ethernet, and in RUN, the other is not, and is in PROG.
At a time to be determined, the processors are both placed in PROG, the ethernet cable is moved, and then the one with the cable is placed into RUN. When this happens, the communications do not restore.
The ethernet cable is attached to a switch, and the only communications to it are from a PanelView Plus 1250. If power is cycled to the panelview or the SLC, the communications are normal.
So, the question remains:
Can any software be written to 'initialize' or flush the channel?
ethernet channel on a SLC 5/05 on first scan of the program?
The reason is as follows:
I have two identical processors, powered all the time.
One is connected to the ethernet, and in RUN, the other is not, and is in PROG.
At a time to be determined, the processors are both placed in PROG, the ethernet cable is moved, and then the one with the cable is placed into RUN. When this happens, the communications do not restore.
The ethernet cable is attached to a switch, and the only communications to it are from a PanelView Plus 1250. If power is cycled to the panelview or the SLC, the communications are normal.
So, the question remains:
Can any software be written to 'initialize' or flush the channel?