toddp65
Member
While trying to download produced and consumed tags with a new controller on the same network I get this error:
The maximum number of nodes on the local Ethernet port has been exceeded. Reduce the number of Ethernet nodes to 16 or fewer.
I guess it's self explanatory but is there anything I can do? The tree is connected with two other external controllers and internet/IP VFDs.
Thanks
The maximum number of nodes on the local Ethernet port has been exceeded. Reduce the number of Ethernet nodes to 16 or fewer.
I guess it's self explanatory but is there anything I can do? The tree is connected with two other external controllers and internet/IP VFDs.
Thanks