Hi forum,
I would like to know the best way to control work of 3 pumps depending on working hours. 2 of 3 pumps should work, while 1 should be stopped but ready to start.
After X hours, pump with most working hours should stop and the one which was stopped, should start.
And cycle repeats again after X time.
Thanks
I would like to know the best way to control work of 3 pumps depending on working hours. 2 of 3 pumps should work, while 1 should be stopped but ready to start.
After X hours, pump with most working hours should stop and the one which was stopped, should start.
And cycle repeats again after X time.
Thanks