hi all,

i'm new to plc programming and i was looking for some help with a project. i have 2 pumps pumping out water from a tank . one pump start at a level low level say 1 m the other pump starts at 2 m. Both of the pumps are to stop at 0.5 m level .

There are two level switches for minimum and maximum . analog input range is 4-20mA corresponding 0-4 m of water level

if one pump fails the other should cover ,pumps to change priority of starting every week and two pumps can not start at the same time.

pumps should be running on automatic.

anyone who can do this program on tia portal . thanks

controller : 1212C ad/dc rly

1221 DI 8 x 24VDC 6ES7 221--1BF0-0XB0

1231 AI card 4X13 BIT 6ES7 231-4HD30-0XB

a sample project would be great . cheers and good health on this corona season.
 
Welcome to the forum!

Show your work/what you've tried and folks with TIA Portal knowledge will help you out but not do it for you.

Good Luck.
 
here is what i have done so far

View attachment pump control.pdf
i am not familiar with the sequencing of the pumps i tried to use the the rd_sys_t function in tia portal to set the changes of pump priority to change on every Sunday which so far isn't working as i wanted .
 

Similar Topics

Hello Guys, I have tried the programming but can't twist my mind to make it work correctly. I'm using S71200 and TIA Portal. My system has...
Replies
1
Views
211
Hi, I started off my career in PLC programming doing water/wastewater on AB around 20 years ago, but then moved overseas a few years later and...
Replies
57
Views
12,151
Does anyone have any experience in this? I have a lead lag pump setup for water that is maintained by pressure using VFDS, the idea is to have...
Replies
6
Views
1,845
Hey guys, I have a client that has a pump they want to control based on what day of the week it is. As in, on Monday have the pump turn on at a...
Replies
6
Views
2,110
Hi forum, I would like to know the best way to control work of 3 pumps depending on working hours. 2 of 3 pumps should work, while 1 should be...
Replies
11
Views
4,462
Back
Top Bottom