STEP7 GRAPH multi sequences

makrodom

Member
Join Date
Dec 2012
Location
Ada
Posts
7
Hi all!

I have one question:
How do i create in a STEP7 GRAPH object in which more than one (2,3...) sequence running?

Thx!

graph.JPG
 
Right click on the Transiton where you want to start the simultaneous branch and select Open to open the branch.

G1.jpg
 
Drag the closing branch to the transtion required. (Note that this screen show doesn't show the little icon that appears as you drag the end of the branch around the screen)

G3.jpg
 
Hi!

Thx for answer!
I take a question again, but differently...

How do i create in a STEP7 GRAPH object in which more than one (2,3...) sequencer running? Each sequencer is running (Sewuencer 1, Sequencer 2, Sequencer 3, ...)?
In example each Sequencer is running (Sequencer 1 and Sequencer 2 is green).
How?

Thx!

graph_all_seq.JPG
 
Right click on the start step of the second sequence and choose properties. Then tick "inital step" you can have more than one inital step
 

Similar Topics

Hi! I've got many stations that basically have the same startup processes, but each do a different sequence of steps. So what I want is to have...
Replies
6
Views
3,449
Doen anybody know what really is the difference between these two option packages for STEP7 ? Siemens sales pitch is very sketchy on what you...
Replies
6
Views
5,355
This is the first time I am working with Simatic Manager Step7 as I started my siemens journey with TIA which is pretty easy and do a lot of stuff...
Replies
3
Views
150
When you download a DB, the values get overwritten by what is in the "actual" column in offline DB. Does this happen at the start of the PLC...
Replies
6
Views
147
Hello Inside a FB, I´m trying to transfer a string from a DB to a IN_OUT var that was define as a UDT. The problem is that i can´t determine the...
Replies
4
Views
141
Back
Top Bottom