I have a question, which would be most effective setting up an old PLC5 rack as an I/O scanner or replacing it with a swing arm system for a control logix conversion? I know the swing arm is not cost effective for my situation currently but it is defiantly the faster option from what I have read so far.
Thank you
I have a question, which would be most effective setting up an old PLC5 rack as an I/O scanner or replacing it with a swing arm system for a control logix conversion? I know the swing arm is not cost effective for my situation currently but it is defiantly the faster option from what I have read so far.