GE PLC 90-30 Date and Time activated events

DavidDC3

Member
Join Date
Oct 2016
Location
Pasadena, Texas
Posts
4
I am not sure if it is possible but I am looking to try and have my GE 90-30 Have certain things happen at certain times on various days. Does anyone know of a way to make this happen or a function that could make this happen?

Specifically I want a pump to come on every day at 8 am for 50 minutes but I would like to do a lot of other things if Date and Time are able to be used.

Even better, is there a memory location where it is keeps the current date and time that I could base events off of?

Thanks,
DC
 
.SwxCF - is the Proficy Project Configuration
.INI - is no longer needed but may hold some settings for Proficy and not part of newer backup files
.varCF - is the Variable Configuration used by Proficy
.ZDRW - Would be removed from the .zip file and Imported into the Toolchest as a way to get it into an older (or any) version of Proficy.
 

Similar Topics

Hello, I have an automation direct d2 262 plc and C-more HMI EA9T6CL-R. I need to prepare a program, scheduled to be performed on a future date. I...
Replies
1
Views
119
Hi All, we've recently upgraded from FTView SE v10 to v12. Since the upgrade we've been having a problem where the HMI is slow to update tags in...
Replies
0
Views
88
I have 10 years expereience about programming TwinCAT2 PLC. However, there is still one thing that I can't find a best solution about updating the...
Replies
0
Views
798
Hello, I was wondering if anyone know how to upload a PLC program to the Beckhoff TwinCAT 3 from a file? i.e. without having the development pc...
Replies
0
Views
758
Hello everyone, I want to know if there is a way to create or add a licensing or/and expiration date for Siemens PLC or if there other brand that...
Replies
26
Views
10,738
Back
Top Bottom