I am making some changes in a control logix PLC program that an engineering programmed for my company. In the program they have used the same I/O points in differnet tasks. I have noticed that some of them are overridding others and not letting the program operate as designed. I am trying to consolidate the I/O points so that there is only one instance of each I/O point in the program.
I am trying to figure out if I should have a seperate I/O section or have all the I/O in the main program (routine/task).
what has everyone else done when faced with this?