i've been asked to look at a machine that uses a old 1st gen S7 216, the PLC doesn't seem to be operating correctly and may need replacing. i'm fairly new to PLC's and programming and have a lot to learn, i was wondering if i'd be able to use the program from the older PLC in a newer gen S7 226 PLC without any problems or having to tweak it in anyway, would this be ok?