Simple solutions

RoTaTech

Member
Join Date
May 2003
Location
Cobourg, ON, Canada
Posts
418
Forgive me if this has been posted, and I do not know how to cite the original author. I found it on a jokes forum, but I'm sure some of us have seen similar problems and solutions.

A toothpaste factory had a problem. They sometimes shipped empty boxes without the tube of toothpaste inside. This challenged their perceived quality with the buyers and distributors. Understanding how important the relationship with them was, the CEO of the company assembled all of his top people. They decided to hire an external engineering company to solve their empty boxes problem. The project followed the usual process: budget and project sponsor allocated, RFP, and third-parties selected.
Six months (and $8 million) later they had a fantastic solutution - on time, on budget, and high quality. Everyone in the project was pleased.

They solved the problem by using a high-tech precision scale that would sound a bell and flash lights whenever a toothpaste box weighed less than it should. The line would stop, someone would walk over, remove the defective box, and then press another button to re-start the line. As a result of the new package monitoring process, no empty boxes were being shipped out of the factory.

With no more customer complaints, the CEO felt the $8 million was well spent. At the end of the first month, he reviewed the line statistics report and discovered the number of empty boxes picked up by the scale in the first week was consistent with projections, however, the next three weeks were zero! The estimated rate should have been at least a dozen boxes a day. He had the engineers check the equipment and they verified the report as accurate.

Puzzled, the CEO traveled down to the factory, viewed the part of the line where the precision scale was installed, and observed that just ahead of the new $8 million dollar solution sat a $20 desk fan blowing the empty boxes off the belt and into a bin. He asked the line supervisor what that was about.

"Oh, that," the supervisor replied,"Bert, the kid from maintenance, put it there because he was tired of walking over, removing the box and re-starting the line every time the bloody bell rang.”
 
Very nice! Bert used the old noggin to reduce his work load. Too bad the company didn't ask maintenance first. I bet they would have gladly shared the $8 million with eveyone in the department. (y)

Next, if the company offfered a $ incentive for employee ideas to save production costs, good old Bert might figure out how to add a conveyor to catch the empty unused boxes and recycle back around to the front of the line!
 
Last edited:

Similar Topics

Hello, I´m having a problem trying to program in Ladder. An output should be trigged by two possible contacts. Take a look on the printscreen...
Replies
5
Views
193
Hello again..trying something on an existing poorly written program and just wanted to double check something system is an A-B MicroLogix 1200 In...
Replies
5
Views
204
Hi all, Writng a FB in ST on Beckhoff TC for a pulser which turns on and off on a cycle, is paused by turning bControlInput to FALSE, but resumes...
Replies
6
Views
310
I'm trying to build my Classic Step 7 programming skills this weekend. I get stuck on little things that are not covered in YouTube tutorials. I'm...
Replies
7
Views
355
I have a program that does a 7 second "scan" sensor calibration routine whenever a setting (setting is called assistance level or "AL" and ranges...