Dear,
i was asked to put an analyzer on the remote chamber and accordingly to close a gate at the pumpig station to stop the TSE from flowing into the pumping station pit.
I was searching over the net and i found that the most of the operating temperature of the NH3 analyzers is maximum 40 degree C, so i have to find a way to put it near the inlet pipe of the pumping station (maybe taking sample from the inlet pipe of the pumping station pit) (is it feasible) and maybe i can put the analyzer in the electrical room. What do u suggest?
Find attached the selected model from HACH for NH3 Analyzer and also attached the sketch showing the system.
i was asked to put an analyzer on the remote chamber and accordingly to close a gate at the pumpig station to stop the TSE from flowing into the pumping station pit.
I was searching over the net and i found that the most of the operating temperature of the NH3 analyzers is maximum 40 degree C, so i have to find a way to put it near the inlet pipe of the pumping station (maybe taking sample from the inlet pipe of the pumping station pit) (is it feasible) and maybe i can put the analyzer in the electrical room. What do u suggest?
Find attached the selected model from HACH for NH3 Analyzer and also attached the sketch showing the system.