CapaceteJR Member C Join Date Mar 2024 Location Rio De Janeiro Posts 4 Apr 9, 2024 #1 Has anyone already worked with ALTOPACK equipment, model AVE-PC (VFFS). Year 2009, I need to do a retrofit for this equipment, has anyone already done this retrofit, what technology was used?
Has anyone already worked with ALTOPACK equipment, model AVE-PC (VFFS). Year 2009, I need to do a retrofit for this equipment, has anyone already done this retrofit, what technology was used?