Hi All,
Is it possible to alter the project date/timestamps for concept 2.6 projects?
I have a remote PLC that I need to connect to but the PLC and progammer have different expected times/dates. I am confident that the offline program and configs etc are the same but I can't get an equal status. The 'include IEC upload information' is unchecked causing upload not to function correctly.
I need to invert some I/O and don't really want to do a download over the analogue modem.
Any ideas would be welcome.
Cheers
Chris
Is it possible to alter the project date/timestamps for concept 2.6 projects?
I have a remote PLC that I need to connect to but the PLC and progammer have different expected times/dates. I am confident that the offline program and configs etc are the same but I can't get an equal status. The 'include IEC upload information' is unchecked causing upload not to function correctly.
I need to invert some I/O and don't really want to do a download over the analogue modem.
Any ideas would be welcome.
Cheers
Chris