Hello Friends
I Have a FX3G CPU and I am modifyind the program to add new models.
I have tried to add several rungs but an error appears:
The program capacity will be exceeded.
Please increase the program capacity or delete some instructions.
In the Project tree I have checked the PLC Parameter and I have noticed that the Program Capacity is 4000 steps, I have exceeded this number.
I have modified the Memory Capacity option to 32000 and the Program capacity changes to 20000 steps.
Is it enough to continue with my program or Do I need to do something more?
Do I need to change the PLC or add a memory or something else?
Thanks in advance.
I Have a FX3G CPU and I am modifyind the program to add new models.
I have tried to add several rungs but an error appears:
The program capacity will be exceeded.
Please increase the program capacity or delete some instructions.
In the Project tree I have checked the PLC Parameter and I have noticed that the Program Capacity is 4000 steps, I have exceeded this number.
I have modified the Memory Capacity option to 32000 and the Program capacity changes to 20000 steps.
Is it enough to continue with my program or Do I need to do something more?
Do I need to change the PLC or add a memory or something else?
Thanks in advance.
Last edited: