Good morning, First time using the forum and first time programming a plc. I am building a controller for a 100 hp irrigation well. I am using a Click analog plc and Cmore micro hmi. There are 8 inputs(phase condition, valve position, control voltage,ect...) that must be true before the well starts. If any one of the inputs goes false the well must shut down. If one of the inputs goes false I want the hmi to show the fault, and send a signal to a scada system.
My question is this..can I put all the inputs on one rung of code or is it better to put them each on a separate rung ? I want the program to be simple but easy to understand in my absence. Would this be "good" or "bad" programing?
Thanks for your thoughts Tom