mgregory99
Member
upgrading client in field. using RMPS feed PIDE in order to single cycle ramp feeding PIDE block.
have RMPS set up for units/hr ramp control.
RMPS feeds PIDE into cascade setup
question is this: the RMPS is told to ramp at say 300 units/hr. the setpoint required should still be fed into the PIDE?
don't see how to tell the RMPS the target value for this
this should be simple, but trying to sort out tonite prior to returning to site in the morning.
thanks in advance for any pointers here