Hi

While running the compare tool for two Projects, I am getting the attached difference in Program and Run. See attached.

The difference seems to be only graphically

Is it normal that the compare tool gives project difference even if there is slight difference in rung position?

As per my knowledge there is no difference in both the programs in terms of ladder logic execution, Please correct me if I am wrong.

Will appreciate Any insight and any info on this.

aa.jpg
 
Last edited:
In the base project the branch level is extended. In the compare project the branch level is added. There really should be no difference except maybe scan time?
 
In the base project the branch level is extended. In the compare project the branch level is added. There really should be no difference except maybe scan time?

+1 agreed: no logical difference, the only functional difference would be the timing.

If OP double-clicks on the [0009] rung number on each, the "difference" will be apparent because there will be a few (one?) extra BST-BND pair.

Also note that the outer/bottom branch test [XIC L86WHRU XIO LRESET] could be appended as an extension of the inner branches. That said, this is a State Coil/Fault Coil pattern (see this link), with the inner branches composing the trigger condition, and the outer branch comprising the seal-in and break conditions, so leaving it as is makes it easier to understand.
 
Yes, position matters to the compare tool. But placing a new branch under an existing branch is different from extending an existing branch.

Your example on the left is considered one parallel branch with multiple levels, while the example on the right is a nested branch. Two branches, each with their own levels. Logically yes, they will function the same. However, nested branches are slower to scan and consume more memory. It is a small difference, but it is a difference.

Branches are actual instructions. Including the branch instructions, your example on the left contains 15 instructions. The example on the right contains 17 instructions. So of course, the report will identify that as a modified rung. It is more of a syntax check, not a logic check.

OG
 

Similar Topics

Hello, What is the Problem: I have an old version of projects with all the tags' descriptions and a new one without them. I know how to...
Replies
6
Views
3,158
Hi friends. Just wondering if anyone know how to remove recent project from the RS5K Quick Start>Recent Projects window. And as well from Factory...
Replies
3
Views
1,959
Last week we replaced two computers running XP Pro and RSView 32 with two new computers also XP Pro but upgraded to FactoryTalk SE.(15 displays)...
Replies
7
Views
16,393
A customer has sent me an ACD file created with RSLogix 5000 v16.03. I'm trying to open with v16.00 with it is saying that the project is...
Replies
2
Views
2,987
RSLogic 500 has a compare project feature. does 5000 have something similar or not Thanks