Mas01
Member
General Question:
The PLC and HMI that I've been working on (a laser measurement system) is soon to be transported to the site where it will be used.
It will be Version 1.0.
How do I put the project into config control, so that I can keep track of further changes? e.g. an upgrade to version 1.1 then version 1.2, at some point in the future.
What sort of config control software do you typically use with TIA, or is there one built into the software somewhere?
Thanks
The PLC and HMI that I've been working on (a laser measurement system) is soon to be transported to the site where it will be used.
It will be Version 1.0.
How do I put the project into config control, so that I can keep track of further changes? e.g. an upgrade to version 1.1 then version 1.2, at some point in the future.
What sort of config control software do you typically use with TIA, or is there one built into the software somewhere?
Thanks