Hi guys,
Please I need a rough estimate or idea rather (in USD)
For a PLC Programming and HMI screen design/configuration contract Project of 50 I/Os,
HOW MUCH WILL BE AVERAGE CHARGE FOR THE PROGRAMMING (separate) AND HMI (separate).
INFORMATION:
This is Oil and Gas sector.
Please ignore Project continent Location. Assume an average estimation please.
Thanks in Advance
Please I need a rough estimate or idea rather (in USD)
For a PLC Programming and HMI screen design/configuration contract Project of 50 I/Os,
HOW MUCH WILL BE AVERAGE CHARGE FOR THE PROGRAMMING (separate) AND HMI (separate).
INFORMATION:
This is Oil and Gas sector.
Please ignore Project continent Location. Assume an average estimation please.
Thanks in Advance