Thank you for all the replies! I will try as many of these ideas as i can today.
To clarify my setup. It goes pump ->manual valve->flow sensor->solenoid valve. There is a smallish space between the sensor and valve but since I'm overfilling that shouldn't matter. As for the volume in the line after the valve i give it time to drain out. In the actual setup the distance from the valve to jug will be very small.
Also to retierate. I am using a Keyence FD-XS20(I think I linked to it in OP. Let me know if it doesnt work.) It is an ultrasonic clamp on meter.
As for the 50ms idea I like that. Would be a tad less accruate possibly but If it save my overfilling that would be a huge step.
More info to come later today!
To clarify my setup. It goes pump ->manual valve->flow sensor->solenoid valve. There is a smallish space between the sensor and valve but since I'm overfilling that shouldn't matter. As for the volume in the line after the valve i give it time to drain out. In the actual setup the distance from the valve to jug will be very small.
Also to retierate. I am using a Keyence FD-XS20(I think I linked to it in OP. Let me know if it doesnt work.) It is an ultrasonic clamp on meter.
As for the 50ms idea I like that. Would be a tad less accruate possibly but If it save my overfilling that would be a huge step.
More info to come later today!