Hi,
This may be one of those questions which has a glaringly obvious answer but it escapes me entirely... I have two projects open [offline] in Simatic Manager (V5.2)
1. the master version of programs from 12 siemens 31x plcs
2. the corresponding uploads directly from the system
Now the timestamps of the DBs match and I would like for it to stay that way but also merge the online data VALUES into the version with the offline SYMBOLS.
Surely this is not too much to ask(???) I mean, I hear that I can do it DB-by-DB while online(?), or write a program or use a utility but could someone please confirm that that is necessary?
Thanx!
This may be one of those questions which has a glaringly obvious answer but it escapes me entirely... I have two projects open [offline] in Simatic Manager (V5.2)
1. the master version of programs from 12 siemens 31x plcs
2. the corresponding uploads directly from the system
Now the timestamps of the DBs match and I would like for it to stay that way but also merge the online data VALUES into the version with the offline SYMBOLS.
Surely this is not too much to ask(???) I mean, I hear that I can do it DB-by-DB while online(?), or write a program or use a utility but could someone please confirm that that is necessary?
Thanx!