My point exactly: Re Bashing

I have been put in charge of making any system modifications to the Direct Logic 05 unit which maintains all the critical temperature limits for the reactor.

Lancer is teasing us again. Everybody knows that the DL-05 has been submitted to the US Atomic Energy Commission for certification in nuclear plants, but has not yet been cleared...
 
Everybody knows that the DL-05 has been submitted to the US Atomic Energy Commission for certification in nuclear plants, but has not yet been cleared...

When they were first introduced, Sherlock Holmes took one look at Dr. Watson and observed, "You have been in Afghanistan I perceive". In that same spirit, I conclude that the PLC inside a Mr. Fusion must be a DL05.
 
Just thinking about it, I think Doc Brown said the trains time circuits were steam driven. Does anyone remember that?

I love those movies, I don't know why I don't go buy them
 

Similar Topics

We are having issues with our viewpoint server randomly crashing and only loading the error page if anything at all. It lives on 3 servers all of...
Replies
0
Views
60
Good morning, I have a question regarding some point I/O modules. We use 1734-IE2V modules to measure the tension of a fiber, but we have quite a...
Replies
2
Views
85
Hi, I have some problem with View Point which I'm using to manual control of conveyors. On begin when in network was only PLC and HMI View Point...
Replies
0
Views
99
I have a bunch of tags in Historian/VantagePoint that off by one decimal point. I looked into the HMI displaying the same number, and the HMI is...
Replies
2
Views
136
Good morning, I have a Emerson/GE PLC with Cimplicity SCADA. I need to export data of a specific point/object to a CSV file and load the CSV file...
Replies
7
Views
328