Anyone have an idea of how to create a FIFO que and storage network using only the folowing instructions (and,or,not,xor).
I'm working on a legacy PLC that does not have an expanded instruction set and upgrading to one is cost and time prohibitive.
For example, you have a conveyer belt with boxes marked 'a' and boxes marked 'b'; they need to be separated into two containers based on their markings. The boxes are ID'ed at point 'x' 50 feet before the separator, which takes a few seconds to to transition between the containers. The boxes arrive in no particular order.
Thanks in advance for any help
I'm working on a legacy PLC that does not have an expanded instruction set and upgrading to one is cost and time prohibitive.
For example, you have a conveyer belt with boxes marked 'a' and boxes marked 'b'; they need to be separated into two containers based on their markings. The boxes are ID'ed at point 'x' 50 feet before the separator, which takes a few seconds to to transition between the containers. The boxes arrive in no particular order.
Thanks in advance for any help