Their is a big project that I'm currently modifying the plc program to. Before i fully implement for a Start up i always like to do an IO checkout first.
So here is my question:
The PLC is a SLC 5/05
if i disable the routines the call the IO with an always off or an AFI instruction, then proceed to Force the Outputs for testing to see if they work and for the inputs if i just see the input data tables will that work for an IO checkout, all the IO is digital btw. So let me know as i have not used SLC plc's before. Thanks in advance.
Their is a big project that I'm currently modifying the plc program to. Before i fully implement for a Start up i always like to do an IO checkout first.
So here is my question:
The PLC is a SLC 5/05
if i disable the routines the call the IO with an always off or an AFI instruction, then proceed to Force the Outputs for testing to see if they work and for the inputs if i just see the input data tables will that work for an IO checkout, all the IO is digital btw. So let me know as i have not used SLC plc's before. Thanks in advance.