Software Timebombs

Hi Janner 10,

One suggestion is if there is some sort of HMI or visual indicator/display on the system, you just keep a pre-programmed message stating that this "PLC Program will be on a trial basis till XX/XX/XXXX and upon completion of project closure will be transition to a full release". This way the "operators" will be pre-warned and they will continuously follow up with their management about getting the project closed? My language I'm sure can be improved but basically provide some sort of visual reminder, which will also cover the safety parameters if you are going to shut it down later if they are not paying their bills.
 
Mr. Bailey is spot on with the escrow arrangement, I've done this in the past for customers that had terrible credit ratings. Usually a lock box arrangement with a local bank. I've even on occasion done UCC filings on the equipment (basically a lien). For those interested, I noticed that UpWork does a escrow arrangement on some contract arrangements.
 
Last edited:
Hi Janner 10,

One suggestion is if there is some sort of HMI or visual indicator/display on the system, you just keep a pre-programmed message stating that this "PLC Program will be on a trial basis till XX/XX/XXXX and upon completion of project closure will be transition to a full release". This way the "operators" will be pre-warned and they will continuously follow up with their management about getting the project closed? My language I'm sure can be improved but basically provide some sort of visual reminder, which will also cover the safety parameters if you are going to shut it down later if they are not paying their bills.

Thanks - I like this suggestion.

Additionally, it won't shut anything down, just set a bit inline with the start button so the cycle can't be started.
 
If they have a programmer on site they can easily bypass this blockade. Unless there is an password on the program?
 
Unfortunately, from time to time I have to protect myself and my work. But before I do that I do following things:
- Make sure that my customer knows that there is protection in PLC before signing agreement and I that it is written in contract,
- I call it trial version, and it is last thing to bill in project (software),
- I make it sure that it happens (blockade) in situation where it is safe for people and process.
 

Similar Topics

I'm using the Siemens PRONETA software to do some IO testing currently. I love the simplicity and fast testing capability. Does anyone know about...
Replies
0
Views
69
Hello all, I am an Industrial Electrician, and deal with a little bit of everything including PLC troubleshooting and programming. When I started...
Replies
3
Views
148
HelloI need software to download the program from PLC EH-A28DRP from an old machine whose manufacturer does not exist. It may be Ladder Editor for...
Replies
2
Views
122
Hi PLC people, think about this scenario: The PLC is somehow connected to the same network with the facilities` network. Then someone connects to...
Replies
2
Views
146
i have 2 backups: *.PVC and *.pvd file types thanks in advance for any help
Replies
4
Views
162
Back
Top Bottom