I am changing out a series Six with a 90-30.
I specified a remote baseplate (IC693CHS393) for some I/O
as the distance was 500' from the main rack.
The wires used for the new baseplate are different
from the ones used for the series six.
Here's where the problem began: The conduit I intended to use for the new wire runs under a hiway and across a dam. The sand the road department uses in the winter has filled into the conduit and has cemented the existing wires in place. Running a new conduit is not an option as the bureauracacy of the hiway dept and the dam people would be intolerable to coordinate digging and replacing the conduit.
Is it possible to find another way of getting the remote I/O info
by using the existing wires with some of the existing I/O already purchased?
Thanks in advance
I specified a remote baseplate (IC693CHS393) for some I/O
as the distance was 500' from the main rack.
The wires used for the new baseplate are different
from the ones used for the series six.
Here's where the problem began: The conduit I intended to use for the new wire runs under a hiway and across a dam. The sand the road department uses in the winter has filled into the conduit and has cemented the existing wires in place. Running a new conduit is not an option as the bureauracacy of the hiway dept and the dam people would be intolerable to coordinate digging and replacing the conduit.
Is it possible to find another way of getting the remote I/O info
by using the existing wires with some of the existing I/O already purchased?
Thanks in advance