help needed with dde/excel

Join Date
Mar 2004
Location
somewhere up north...
Posts
6
We have upgraded our plc to cs1 65h-h from c200hs and using cx-programmer versus syswin 3.4. With the upgrade i realized that i could use cx-server dde manager to monitor through an excel worksheet almost anything that i could think of. The plc programming matrix is quite complete, using the E0 and E1 banks as retention areas. So far, my excel worksheet reflects the mill's production in real time through predefined hours, which i then move to be analyzed. I began entering dde points in order to show data every hours from 0700 to 1700 and to demonstrate how the mill's production was developping. Then i realized that it was time consuming and was greatly slowing down my computer (speed of comm between terminal and plc). I just know enough in excel to make it nice and clean, and dont know anything about excel' macros. I am looking for excel examples that would move every hours the data collected in predefined columns, or a way to enter a range of points at once (from E1_000 to E1_200) and so forth through cx-server dde manager.
 
Last edited:

Similar Topics

I have an old PLC (circa 2007) consisting of Telemecanique/Modicon/Schneider Electric devices. The system has developed errors and unfortunately...
Replies
2
Views
230
Hi I’m after some help , I have a plc program with a baumer verisens vision camera attached I have got the signals working ect but I have an...
Replies
9
Views
958
Hi all, We are facing synching issues with redundancy module, where the Primary is ending up with disqualified secondary. Normally this would...
Replies
2
Views
625
Hi all, I have got this machine that needs to be up and running soon. This machine has Schneider's Controller and I/O modules, 3 vfd's, 2...
Replies
2
Views
911
Is it possible to write to the high speed counter function file "high speed preset" on an AB micro 1100. I have the HSC set up with a MOV...
Replies
3
Views
1,084
Back
Top Bottom