Hello
I would like to ask you for help to solve problem with my FT SE 6.10 project. We have situation like: one server as Directory Server, 2 Windows Server 2008 machines as redundant HMI servers (with firewalls turned off) and 4 clients.
Replication from primary to secondary does not work, but more irritating is that very often after we reboot servers to test how they behave, we encounter problems like Hmi Server failed to load (with secondary server name). Today we lost 4 hours to make project working - after reboot we lost even topics declared in RSLinx Classic.
We checked settings mentioned in the Rockwell manuals and seems to be everything OK. Do we have to set some special properties for SQL FT tag database? Or some special services should be checked on the servers?
Sometimes when we make modifications in the project, we prepare backup. Turn of redundancy. Then we restore project on the second server. Turn the redundancy back on and sometimes it works, sometimes gives error of Hmi Server failed to load on secondary server.
This all staff makes me crazy enough, as the time for commissioning the project is near to end.
If you could give me some advices , I would really appreciate it.
Kind regards.
I would like to ask you for help to solve problem with my FT SE 6.10 project. We have situation like: one server as Directory Server, 2 Windows Server 2008 machines as redundant HMI servers (with firewalls turned off) and 4 clients.
Replication from primary to secondary does not work, but more irritating is that very often after we reboot servers to test how they behave, we encounter problems like Hmi Server failed to load (with secondary server name). Today we lost 4 hours to make project working - after reboot we lost even topics declared in RSLinx Classic.
We checked settings mentioned in the Rockwell manuals and seems to be everything OK. Do we have to set some special properties for SQL FT tag database? Or some special services should be checked on the servers?
Sometimes when we make modifications in the project, we prepare backup. Turn of redundancy. Then we restore project on the second server. Turn the redundancy back on and sometimes it works, sometimes gives error of Hmi Server failed to load on secondary server.
This all staff makes me crazy enough, as the time for commissioning the project is near to end.
If you could give me some advices , I would really appreciate it.
Kind regards.