rscott9399
Member
Hey guys
So this is one of those things that siemens really does better then AB.
Im trying to find a work around for it.
I want to use a simple timer in a rung. But i want to actually place the timer in the rung it blocks.
NOT put the timer in some other rung and use a contact tied to its done bit.
In siemens land this is very normal. A block in siemens with several outputs can have the outputs physically tied to the rung.
AB will not allow this.
How can i get around this or make an AOI that does.
For example, in AB the only thing on a TON instruction that can be tied to the rung is the enable. What im trying to do is get the DN tied to the rung instead
Any ideas????
So this is one of those things that siemens really does better then AB.
Im trying to find a work around for it.
I want to use a simple timer in a rung. But i want to actually place the timer in the rung it blocks.
NOT put the timer in some other rung and use a contact tied to its done bit.
In siemens land this is very normal. A block in siemens with several outputs can have the outputs physically tied to the rung.
AB will not allow this.
How can i get around this or make an AOI that does.
For example, in AB the only thing on a TON instruction that can be tied to the rung is the enable. What im trying to do is get the DN tied to the rung instead
Any ideas????