I was just called out to a site. one of our instrument techs added an I2p for valve Control on a Micro. Then it wasn't working right. so he made logic changes to the offline file that said it was most current... this is where he made the mistake. he should have pulled the most recent load out of it... now he is missing an adjustable timer for a DO. I also don't have direct access to scada so it sounds like I'll just have to make my own thing and then get the guy on scada to fix it...
Just waiting on him to send me.the load he dumped in. not sure if anyone on here is familiar with the Bristol RTUS. but thought I'd ask .
Just waiting on him to send me.the load he dumped in. not sure if anyone on here is familiar with the Bristol RTUS. but thought I'd ask .