Hi Guys,
I've got a problem with two redundant ControlLogix PLCs using the redundancy modules and I am not very familiar with them.
They were working fine until a few days during an outage. Now the Primary PLC is working fine, however the secondary PLC is in Program Mode (both key switches are in Remote) and the redundancy module on the secondary is stuck in DISQ.
I have tried power cycling both racks and re-seating both modules and tried using the RMCT to synchronize secondary however cannot get the secondary redundancy module back into SYNC or the PLC into RUN mode.
I don't know who has had their fingers on the PLC, could it be that someone turned the keyswitch on the secondary into Program mode and back into Remote? Would that keep the PLC stuck in Remote Program?
I cannot seem change the mode into RUN on the secondary PLC via the software.
Should the secondary PLC be in RUN mode even if it's redundancy module in not SYNCed?
Thanks in advance for your time!
I've got a problem with two redundant ControlLogix PLCs using the redundancy modules and I am not very familiar with them.
They were working fine until a few days during an outage. Now the Primary PLC is working fine, however the secondary PLC is in Program Mode (both key switches are in Remote) and the redundancy module on the secondary is stuck in DISQ.
I have tried power cycling both racks and re-seating both modules and tried using the RMCT to synchronize secondary however cannot get the secondary redundancy module back into SYNC or the PLC into RUN mode.
I don't know who has had their fingers on the PLC, could it be that someone turned the keyswitch on the secondary into Program mode and back into Remote? Would that keep the PLC stuck in Remote Program?
I cannot seem change the mode into RUN on the secondary PLC via the software.
Should the secondary PLC be in RUN mode even if it's redundancy module in not SYNCed?
Thanks in advance for your time!