Creating A scheduler on FactoryTalk View

keristos

Member
Join Date
Aug 2011
Location
Malta
Posts
65
I am new to FactoryTalk View and I need to create a scheduler so that the user can input the Date and times he would like specific equipment to operate at.

Say,
Pump001 should operate Monday - Friday, 8:00 - 17.00
Pump002 should operate Saturday - Sunday, 19:00 - 0:00

etc etc

Any ideas on how I could do this?

Thank you
 
Welcome
Assuming the the controllers are already programed this way you need to use Numeric Inputs on a display screen and point the tags to the correct memory location in the controller.
Do you know if the controller are already set-up to run this way.?
What are the controllers that you are using.?
Can you post the code for the controller.? [Zip it first-Forum rules]
By posting the code we will be able to help you much faster.

HTH
 

Similar Topics

The idea here is to provide for a brief rapid influx of message codes while preventing sequentially repeating the same message. i.e. if two...
Replies
23
Views
691
Hello everyone, In a factory where we installed Citect 7.20 the computer began to show the first signs of end of life. They never considered...
Replies
0
Views
75
Hi everyone, I'm a last year student at the university in Ghent, and for my thesis i need to write a TwinCAT program that writes data to a .daq...
Replies
0
Views
144
When I go to create a new module in Studio 5000 I can't enter any information for the IP Address or change any other fields. Is there any fix to...
Replies
1
Views
255
Hello I am kind of new to the Rockwell world, i've mainly worked with Siemens and Schneider untill now. I am to make a HMI application running...
Replies
7
Views
1,066
Back
Top Bottom