This the problem guys
I am installing flow meters at different sections of the plant to measure %loss in production.
Since the flow meters are there I also want to use them to produce figures of production over each shift.
I would think that I should integrate the flow rate in order to obtain this figure.
How exactly do I write the ladder logic for this application.
Hardware: Allen Bradley PLC5 Enhanced
Software: RSLogix5
And if there is anyone with this information I also wanted to know what are some of the common errors that exist with this system
I am installing flow meters at different sections of the plant to measure %loss in production.
Since the flow meters are there I also want to use them to produce figures of production over each shift.
I would think that I should integrate the flow rate in order to obtain this figure.
How exactly do I write the ladder logic for this application.
Hardware: Allen Bradley PLC5 Enhanced
Software: RSLogix5
And if there is anyone with this information I also wanted to know what are some of the common errors that exist with this system
Last edited: