Help with logic for variable shift times.

dylantzips

Member
Join Date
Jun 2018
Location
Ohio
Posts
27
I am trying to make it so when someone inputs a starting shift time into the admin page of the HMI, the PLC sees this change and knows what shift it is when it scans after a power cycle. I already have everything figured out except for the logic itself. I tried using limits but it gets a little confusing when you start throwing in minutes greater than zero. So, can someone show me how to set this up so that none of the shift times contradicts each other?

** I already have it programmed so it will change shifts while the machine is on, I just need to figure out how to get it to recognize the correct shift after a power cycle and first scan.

Sorry for the poor wording, I am new to this.
 

Similar Topics

Hello, I am trying to replicate a piece of logic on the PLC5 onto an SEL RTAC. I am using ladder on SEL and FBD. I am having issue on the ladder...
Replies
13
Views
260
Working on project will update after it is completed.
Replies
2
Views
363
Can someone help me piece this problem together. I have a lot of it down I think but cannot seem to get it right. Probably an easy one for most on...
Replies
1
Views
310
Hi everyone, I'm working on a project that involves using a Keyence LR-X100 sensor in Studio 5000 V35 ladder logic to determine the object's...
Replies
4
Views
691
Hey. I am new to PLCs and LogixPro. A friend and I have been trying to build this diagram and instructions using LogixPro500. Could anyone help us...
Replies
15
Views
1,314
Back
Top Bottom