Freak Member F Join Date Oct 2006 Location Barossa Valley Posts 195 Apr 17, 2016 #16 Yes - Engineering Zero Scale =100% and Engineering Full Scale = 0%
NetNathan Lifetime Supporting Member N Join Date Nov 2011 Location Corona, CA Posts 2,199 Apr 17, 2016 #17 Yes....if the tag will let you use a higher "raw" number to reference a lower "engineering" unit and a lower "raw" number to reference an upper "engineering" unit. "Raw" is from RTU and "Engineering" is how it is shown and logged in Citech.
Yes....if the tag will let you use a higher "raw" number to reference a lower "engineering" unit and a lower "raw" number to reference an upper "engineering" unit. "Raw" is from RTU and "Engineering" is how it is shown and logged in Citech.