Sorav.Kumar
Member
We are doing load shedding for Refinery having 2 Gas turbine Generator(25 MW each) for critical loads and a Public grid supply (10 MW)for non critical loads
We are going with PCS7 for this project.
I have read many load shedding schemes like Max. Demand based load Shedding,Data Management Load Shedding,Under frequency based load Shedding,Generator Status based load shedding but couldn't get a clear picture.
Can anybody provide me details structure for various load shedding scheme or algorithm for the same who has done similar kind of projects
Thanks in advance
We are going with PCS7 for this project.
I have read many load shedding schemes like Max. Demand based load Shedding,Data Management Load Shedding,Under frequency based load Shedding,Generator Status based load shedding but couldn't get a clear picture.
Can anybody provide me details structure for various load shedding scheme or algorithm for the same who has done similar kind of projects
Thanks in advance