kekrahulik
Member
Anyone seen this? Can explain this?
If I look at my status file, the date is 6-13-2023
These values are:
S18 = 2023
S19 = 13
S20 = 6
When I use these in code (PLC is online), I see the values for S19 and S20 switched???
S18 = 2023
S19 = 6
S20 = 13
Even if I think the status file is labeled wrong, S19 is the day no matter how I read it.
If I look at my status file, the date is 6-13-2023
These values are:
S18 = 2023
S19 = 13
S20 = 6
When I use these in code (PLC is online), I see the values for S19 and S20 switched???
S18 = 2023
S19 = 6
S20 = 13
Even if I think the status file is labeled wrong, S19 is the day no matter how I read it.