Hi,
I have a situation with four pumps which have to work 3 duty and 1 standby.
However the question is how I can make work to sequence them every 6 hours (1.2.3 on first six hours; 1.2.4 on second six hours; 1.3.4 on third six hours and 2.3.4 on fourth part of six hours)
I have a situation with four pumps which have to work 3 duty and 1 standby.
However the question is how I can make work to sequence them every 6 hours (1.2.3 on first six hours; 1.2.4 on second six hours; 1.3.4 on third six hours and 2.3.4 on fourth part of six hours)