kamenges
Member
But cgehlhausen's case would be the same if you replace the 'R #At_Break_Vel' in my example with 'A "Bit1" JC Task1' from cgehlhausen's example. The 'A "Bit1"' would AND with an RLO of zero and the jump wouldn't occur.
cgehlhausen never said that the logic he is having trouble with was the first thing in a network, in which case the RLO is taken care of. If this JC occurs in the middle of a network with preceeding logic all bets are off, at least in an S7-3152DP.
Keith
cgehlhausen never said that the logic he is having trouble with was the first thing in a network, in which case the RLO is taken care of. If this JC occurs in the middle of a network with preceeding logic all bets are off, at least in an S7-3152DP.
Keith