bigsteve
Member
Hello. We had our fire suppression system trip last week (while we were snowed out of the plant), and it sprayed so much water that our PLC cabinets leaked. Everything got wet on the inside and some of the equipment at the bottom sat in water (our fire water is potable water, FWIW). There are a couple of AB SLC5/05 racks, an AB Panelview and 3 CH Panelmates, plus multiple other smaller instruments, intrinsic safety barriers, etc in the cabinet. We've been blowing air on the equipment with a fan to dry it out. Is there a good way to test out the equipment before we apply power?