I've converted Professional to Advanced before, I copied the screens from Pro to Advanced. Most of the object settings carried over (animations, etc...) the button events needed configured though. Some background settings (colors, borders, etc...) changed from the original. So while it didn't transfer over completely it still saved many hours re-drawing the screens.
 
how to copy

I've converted Professional to Advanced before, I copied the screens from Pro to Advanced. Most of the object settings carried over (animations, etc...) the button events needed configured though. Some background settings (colors, borders, etc...) changed from the original. So while it didn't transfer over completely it still saved many hours re-drawing the screens.

How did you copy the Screens?
 
I just remembered this morning that both projects were the same version, I opened the professional project as a reference project and performed the copy/paste from there.
 

Similar Topics

I'm little stucked and ask for small help from one with little more experience of vb script. So, I have alarm control window Control1[Alarm...
Replies
3
Views
1,547
Hello, I used TIA Portal v15.0 to create a project with s7 1511 and wincc rt professional and an IO Controller. using profinet to connect all 3...
Replies
3
Views
3,030
Hello all, In an WinCC Professional v15 application I need to filter the alarms by alarm class, not using the filter button on the toolbar of the...
Replies
3
Views
2,572
Hello all, I have a WinCC Project (Pro V16) connected to Information server 2014 SP3. Everything is configured and works as intended using the...
Replies
0
Views
1,491
I am doing something no one else has ever done.... I want a screen that lists all the faults that have occurred in the resent past on one screen...