Hello
I have been thinking in some way to operate 3 pumps in the same way (I have schneider modicon m340 PLC):
-the pumps feed a tank.
- As maximum it can work only 2 pumps of the 3 available.
-The operation of the pumps has to alternate depends on the operating time
I tried to compare the running time of the 3 pumps by timer but I could not. Can you have any idea for it?
Thank you