You think about how long it took you to do the last one. Then you think if the new project will be longer or shorter than that one and you write down a number.
ivo drawingtime is very much experience, and how much is required, for normal work i take 2 hours for A4 and 3 hours in A3
if databse or component info is needed double the time.