Dear Experts,
Thanks in advance for your kind help.

I have a GEO SCADA expert 2022 and configure it as a DNP3 master, also I have multiple DNP3 outstations which are S7-1200.
My client asking me to make a schedule for data polling of each outstation, which means the SCADA server will poll each outstation data at a specific time of the day and all outstations will not communicate at same time of the day to the SCADA.
So, could you help me to execute this task by a smart way as I'm still not expert in GEO SCADA.
Thanks
 

Similar Topics

Dear Experts, I'm just started working with GEO SCADA and I need your valuable help. Currently, I'm trying to edit the alarm limits on MIMIC...
Replies
0
Views
231
Hi all, I am trying to bring in some alarm tags from a SCADApack plc to a Geo SCADA system. The system is existing and configured with working...
Replies
0
Views
1,921
Hi everyone, was hoping I could inquire with the community as I'm stuck in quite a bind. I have a Delta Tau PWM drive model number GPH1020000...
Replies
1
Views
1,495
Dear All, I need to configure the vijoe designer so that the Shneider HMI can communicate with Hot standby (redundant PLC), the communication...
Replies
10
Views
2,709
Hello, im quite new and still learning. I would like to ask is it possible for FATEK PLC to read data value more than 16k? I'm trying to move my...
Replies
0
Views
76
Back
Top Bottom