I have a high speed solenoid valve that I need to connect to a siemens S7-222 PLC... The valve requires a high voltage trigger (48V for 3ms) to open and 24V to sustain. What is the simple way to do this?
Should I use 2 PLC outputs with separate relays and have one connected to 24V and another to 48V supply? The relay connected to 48V will only be ON for 3 ms? Is this possible??
Thanks!