I hv a problem on GE Fanuc 90-30 series PLC.
The PLC is working fine before this, but having a problem last week after have the power trip to the panel.
After all recover back, found that the PLC is not running as normal. Running but the ouput is DISABLE, end up with no control from PLC to the output device.
I hv difficulty to set back the PLC to RUN ENABLE as before.
I really need this team expertise to guide me how to change state from RUN DISABLE to RUN ENABLE in order to make sure the Output can be enable back to normal. I suspect that the output has been change state to Disable, but I cannot change back to Enable state.
Already try to STOP and DISABLE/ ENABLE the OUTPUT, but still cannot change state to RUN ENABLE.
Anybody experience on this before?
The PLC is working fine before this, but having a problem last week after have the power trip to the panel.
After all recover back, found that the PLC is not running as normal. Running but the ouput is DISABLE, end up with no control from PLC to the output device.
I hv difficulty to set back the PLC to RUN ENABLE as before.
I really need this team expertise to guide me how to change state from RUN DISABLE to RUN ENABLE in order to make sure the Output can be enable back to normal. I suspect that the output has been change state to Disable, but I cannot change back to Enable state.
Already try to STOP and DISABLE/ ENABLE the OUTPUT, but still cannot change state to RUN ENABLE.
Anybody experience on this before?