I heard somewhere last fall that either UL oe NEC or some other agency was going to require full documentation on a machine in a plant. This would include schematics, a copy of the plc program, and more.
Has any one else heard anything about this?
I have been all over the internet, searched here, and tried to read through th new NEC book. So far I have found nothing. I was just asked if I had all my documentation in order, that we were getting a surprise inspection soon. I am stumped.
Thanks
Del
Has any one else heard anything about this?
I have been all over the internet, searched here, and tried to read through th new NEC book. So far I have found nothing. I was just asked if I had all my documentation in order, that we were getting a surprise inspection soon. I am stumped.
Thanks
Del
Last edited: