Scenario:
Two different cutting machines drills material and put that on two different stock piles.
The stock piles can have more than one cut i.e. Machines can material from different locations to a stock pile. Which means different Cut number
Collecting machine collects the material from allocated stock pile and pumps up the riser to vessel where the material gets dewatered and stored in holds. it is 1.5 mile long riser so can imagine the delay between the collecting and reaching the dewatering plant in vessel, and then to hold by conveyors.
We need to track the product using cut number, associated concentration, and location from where the material has been cut from.
I can understand its vague but that all I know.
Assuming the material on stock pile on seabed and holds in the vessel will be in layers, how can we track from stock pile to when the material exits the holds off to seashore??
Just some ideas needed please.
Two different cutting machines drills material and put that on two different stock piles.
The stock piles can have more than one cut i.e. Machines can material from different locations to a stock pile. Which means different Cut number
Collecting machine collects the material from allocated stock pile and pumps up the riser to vessel where the material gets dewatered and stored in holds. it is 1.5 mile long riser so can imagine the delay between the collecting and reaching the dewatering plant in vessel, and then to hold by conveyors.
We need to track the product using cut number, associated concentration, and location from where the material has been cut from.
I can understand its vague but that all I know.
Assuming the material on stock pile on seabed and holds in the vessel will be in layers, how can we track from stock pile to when the material exits the holds off to seashore??
Just some ideas needed please.