NaborsCanada
Member
The attached logic is a proto type of the logic that I’m going to use to help determine if we should be installing high line into a Rig. Does anyone have any ideas? I’m also using some type of power quality analyzer to help with my calculations. I know this method isn’t the most reliable way of calculating KWH using PLC, but it may be nice to display to Rig personnel approximately what they are using for power. Attached is MHTML Document Print out of my Logic in RS Logix 5000
Any help would be GREAT
Thanks
Any help would be GREAT
Thanks