Dear,
It is required to control / alternate the operation of the duty / standby jockey pumps in a fire pumping station and in case the duty jockey pump fails, the standby pump will take over.
as per NFPA 20 (attached) the jockey pumps are not required to be listed, therefore, the PLC can do this job, please advice if this is allowable and if you have an comment on this.
thank you!
Charbel
It is required to control / alternate the operation of the duty / standby jockey pumps in a fire pumping station and in case the duty jockey pump fails, the standby pump will take over.
as per NFPA 20 (attached) the jockey pumps are not required to be listed, therefore, the PLC can do this job, please advice if this is allowable and if you have an comment on this.
thank you!
Charbel